SAWS W-6 Upper Segment: Construction for Future Generations - NAT2024

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 7
- File Size:
- 645 KB
- Publication Date:
- Jun 23, 2024
Abstract
San Antonio has experienced sustained growth for decades, putting increased pressure on existing wastewater infrastructure. In June 2013, San Antonio Water System (SAWS) reached a Consent Decree agreement that requires significant improvements to the wastewater system over a 10-year period to reduce Sanitary Sewer Overflows. One of the critical projects was the W-6 Upper Segment Tunnel project to reduce sanitary sewer overflows on an existing sewer main running through Lackland Airforce Base. The replacement project consisted of a new tunnel nearly 29,000 LF of primarily 104" FRP. The project also includes nine shafts and multiple trenchless crossings to make near surface connections to the new works.
Citation
APA:
(2024) SAWS W-6 Upper Segment: Construction for Future Generations - NAT2024MLA: SAWS W-6 Upper Segment: Construction for Future Generations - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.