Sao Paulo’s Brooklin Station: An OPA Contender

Deep Foundations Institute
Dario Libano
Organization:
Deep Foundations Institute
Pages:
4
File Size:
4327 KB
Publication Date:
Jan 1, 2014

Abstract

"The Line 5 Extension, in Sao Paulo, Brazil, is currently the most important investment in public transportation by Sao Paulo’s state government. It will connect the south part of the city to the city center, crossing through four other major Metro lines and stations; all currently in operation. The total extension of the line is 11 km (6.8 mi), and includes a new parking yard for the trains and 11 new stations. The Brooklin Station, one of the new stations due to be open and operating in 2016, has a unique geometry of five secant shafts.The original design included constructing five secant shafts stabilized by two plastic slurry walls using conventional grab technology. One slurry wall, along the Santo Amaro Avenue, was to contain the contamination plumes, and another was for temporary support to enable the excavation of the shafts. The final retaining wall design was changed to a concrete structural diaphragm wall that reduced the construction time of the shafts by half, allowing the contractor to meet the construction schedule. This solution also avoided dewatering effects in a geological region characterized by Quaternary sediments and environmental contamination plumes. It was the first time that a hydromill was used in such a situation in Brazil. The hydromill, by overcutting the panels, increased the quality of the joints, and decreased the probability of having seepage into the shafts. The hydromill also created a seepage barrier and avoided movement of the contaminated plumes.The GeologyLocal geology is composed of a superficial Quaternary soil, basically soft organic clays and sands and gravels. From the depth of 8 m (26 ft) until 18 m (59 ft), geology is composed by tertiary medium compact sand with thin silt-clay layers. From 18 m (59 ft) down, there are alternations between compact silt-sands layers with very hard clays layers. Each is approximately 5 to 10 m (16.4 ft to 33 ft) thick.The Initial Basic DesignThe original basic design of the Brooklin Station was to be constructed from five 40 m (131 ft) diameter intersecting circular shafts, all in a line along the axis of the Metro tunnel, in 555 days. In the excavation sequence, the odd shafts were first excavated, waterproofed and had part of their inside cast-in-place structure built before the even shafts were excavated. During the excavation of the even shafts, part of the odd shaft’s support was demolished and connected with the even support. A 0.8 m (2.6 ft) thick plastic slurry wall, acting together with the wire mesh reinforced shotcrete support, ensured the excavation stability around the five shafts."
Citation

APA: Dario Libano  (2014)  Sao Paulo’s Brooklin Station: An OPA Contender

MLA: Dario Libano Sao Paulo’s Brooklin Station: An OPA Contender. Deep Foundations Institute, 2014.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account