Salt Lake Paper - Basic-Lined Converter Practice at the Old Dominion Plant (with Discussion)

The American Institute of Mining, Metallurgical, and Petroleum Engineers
L. O. Howard
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
8
File Size:
305 KB
Publication Date:
Jan 1, 1915

Abstract

The practice of using acid-lined converters at the plant of the Old Dominion, Copper Mining & Smelting Co. was discontinued early in January, 1913, and replaced by basic-lined converters. The new equipment consists of one electrically operated 12-ft. upright converter stand and two basic-lined shells for same. These shells are provided with twenty-four 1 1/4-in. tuyeres. The mouths are 5 ft. in diameter. Owing to the fact that there is no bedding system or other large storage capacity between the mine and the smelter, the furnaces must handle as fast as produced ore and concentrates, which may vary considerably from day to day, both in tonnage and copper content. Consequently the converter is often crowded to its utmost capacity by the frequent fluctuations in the daily matte supply. From the foregoing, it will be seen that in no way can the 'converter be favored by running light charges or by transferring to it from other stands in operation. Neither can it regularly be allowed to cool between blows, and only occasionally can it be run at as low a temperature as might be wished. No copper precipitate or other foreign material high in copper is available to help out the tonnage. Repairs and alterations or the removal of defective tuyeres must wait until such time as a slight falling off in.the matte supply allows the converting operations to ease up. These variable conditions all combine to interfere with the systematic operating of the converter. The first 12-ft. shell was blown in on Jan. 6, 1913, and ran until June 27, 1913, when it was removed to patch the brick. A record of operations covering this period follows: Shell No. 1. First Campaign, Jan. 6,to June 27, 1913 Commenced blowing............................Jan. 6, 1913. Taken off stand for patching.....................June 27, 1913. Total blowing time..........................2,689 hr. 40 min. Total number of, blows made.............................. 664 Average time of blow............................ 4 hr. 3 min. Tons matte charged.................................. 18,157 Average copper content of matte................ 43.9 per cent. Average time blowing one ton. copper................ 22.5 min. Total copper made............................... 7,250 tons
Citation

APA: L. O. Howard  (1915)  Salt Lake Paper - Basic-Lined Converter Practice at the Old Dominion Plant (with Discussion)

MLA: L. O. Howard Salt Lake Paper - Basic-Lined Converter Practice at the Old Dominion Plant (with Discussion). The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1915.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account