SAG Mill Operations in Sossego Mine (45103cab-e6a5-4b04-8022-901294effa85)

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 9
- File Size:
- 141 KB
- Publication Date:
- Jan 1, 2012
Abstract
"Sossego Mine was the first Vale SAG mill operation to process copper-gold ore. It is located in the state of Para, in the south-eastern Amazon region of Brazil. In the first six years of continuous operation, Vale investigated different alternatives for improving circuit performance by investigating operating conditions, mainly focusing on the SAG mill.Today, after a steady increase over five years the annual production rate seems to have stabilized. It is hoped this work will show how the SAG operating practice have been perfected with time and as new data are collected. Historical data of mill grind-outs and crash stops helped create operation curves depending on the ball charge volume and total charge volume. Also noted were impacts on throughput due to the effect of reducing liner weight and the ore type characteristics."
Citation
APA:
(2012) SAG Mill Operations in Sossego Mine (45103cab-e6a5-4b04-8022-901294effa85)MLA: SAG Mill Operations in Sossego Mine (45103cab-e6a5-4b04-8022-901294effa85). Canadian Institute of Mining, Metallurgy and Petroleum, 2012.