Risk Management of a Gold Heap Leach Project

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 5
- File Size:
- 630 KB
- Publication Date:
- Jan 1, 1994
Abstract
One of the biggest drawbacks of deciding upon a heap leach method of treating gold ore is the risk associated with the full-scale production heaps not performing as predicted by the testwork. This paper examines the key decisions that are taken in the design of a heap leach project, and suggests ways in which exposure to these risks can be minimised. It also looks at monitoring techniques to give early warning of problems and possible remedial actions.
Citation
APA: (1994) Risk Management of a Gold Heap Leach Project
MLA: Risk Management of a Gold Heap Leach Project. The Australasian Institute of Mining and Metallurgy, 1994.