Risk Management of a Gold Heap Leach Project

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
5
File Size:
630 KB
Publication Date:
Jan 1, 1994

Abstract

One of the biggest drawbacks of deciding upon a heap leach method of treating gold ore is the risk associated with the full-scale production heaps not performing as predicted by the testwork. This paper examines the key decisions that are taken in the design of a heap leach project, and suggests ways in which exposure to these risks can be minimised. It also looks at monitoring techniques to give early warning of problems and possible remedial actions.
Citation

APA:  (1994)  Risk Management of a Gold Heap Leach Project

MLA: Risk Management of a Gold Heap Leach Project. The Australasian Institute of Mining and Metallurgy, 1994.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account