RI 5284 Leadville Drainage Tunnel Second Project Lake County, Colo. - Summary

The National Institute for Occupational Safety and Health (NIOSH)
M. H. Salsbury
Organization:
The National Institute for Occupational Safety and Health (NIOSH)
Pages:
55
File Size:
13447 KB
Publication Date:
Jan 1, 1956

Abstract

This report describes the tunneling at the Leadville drainage tunnel, which was resumed in September 1950 with funds made available in the 1950 appropriation of the Department of the Interior. It brings up to date the account of the first project, carried on from December 1943 to August 1945, published by the Bureau of Mines which supervised both the first and second projects. In this report Leadville mining history, particularly related to drainage efforts, and the possibilities for future mine drainage are discussed briefly. An account of the second project, including a description of the operating cycle, exploratory drilling done as a safety measure, surveying procedures, geology, cost data, and other pertinent information, completes the report.
Citation

APA: M. H. Salsbury  (1956)  RI 5284 Leadville Drainage Tunnel Second Project Lake County, Colo. - Summary

MLA: M. H. Salsbury RI 5284 Leadville Drainage Tunnel Second Project Lake County, Colo. - Summary. The National Institute for Occupational Safety and Health (NIOSH), 1956.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account