Reservoir Engineering–General - A Simple Method for Correcting Spot Pressure Readings

The American Institute of Mining, Metallurgical, and Petroleum Engineers
F. Brons W. C. Miller
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
3
File Size:
200 KB
Publication Date:

Abstract

Pressure information for use in material-balance calculations is obtained, where possible, from pressure build-up surveys in shut-in wells. Using proper extrapolation methods, static pressures are obtained which, by averaging, give the field static pressure. Often, particularly in fields with a large number of wells, only spot pressure readings are available. A graphical method is presented here which enables the determination of the corrections which must be applied to the spot readings to give an estinzate of the static pressure. Although the static pressures thus obtained are not so reliable as those from build-up surveys, they are more nearly correct than the spot readings themselves for use in material-balance calculations. INTRODUCTION The average static pressure in a bounded reservoir is determined from a number of individual-well pressure measurements. Where pressure build-up curves are available, extrapolation methods such as described in Ref. 3 may be used to determine the static pressure in the drainage area of each individual well. The possibility of using pressure build-up curves presupposes that each well being surveyed is closed in during a certain period and that, during this time, a pressure recorder is left suspended in the hole. For surveys in fields with a large number of wells, this is usually not feasible for economic and other reasons. Either a large number of pressure recorders would have to be used simultaneously or, using a limited number of recorders, the time interval needed to complete a field-wide survey would be too long. The data obtained for this incomplete coverage are insufficient to permit reliable averaging of the few calculated static pressures over the entire reservoir. In many such cases another type of pressure information is available, i.e., spot pressure readings. During this type of pressure survey all wells are closed-in simultaneously and, after a reasonable shut-in time (e.g., three days), pressure readings are taken by running the recorder in and out of each successive well. These surveys, which are less expensive, are often taken at regular intervals, say once or twice a year. In fact, such surveys are required by the state regulatory bodies in many portions of the united States. These spot readings are normally lower than the static (fully built-up) pressure due to the relatively short shut-in time. No direct means of extrapolating such a reading to the static pressure is available because no pressure build-up record is obtainable. Consequently, these data are inferior to pressure build-up information as a basis for estimating the stabilized reservoir pressure in the drainage area of a specific well. For the common case where abundant spot readings but only a few pressure build-up surveys are available, our studies suggest that it may be possible to design a program which will combine the two types of information and provide an estimate of the average reservoir pressure that is more reliable than that obtainable solely from either set of data. in time) gives a point marked p. The actual static pressure at the time the well was shut-in is marked by p.. The illustration shows that, even if a build-up curve is available and can be extrapolated, a correction
Citation

APA: F. Brons W. C. Miller  Reservoir Engineering–General - A Simple Method for Correcting Spot Pressure Readings

MLA: F. Brons W. C. Miller Reservoir Engineering–General - A Simple Method for Correcting Spot Pressure Readings. The American Institute of Mining, Metallurgical, and Petroleum Engineers,

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account