Remediation Of The Abandoned Waste-Filled Marl Quarry Górka

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 8
- File Size:
- 822 KB
- Publication Date:
- Jan 1, 2006
Abstract
In the non-operational ?Górka? quarry, there are situated both a waste disposal site of an area of 6.7 ha, containing approximately 1 million ton wastes from high aluminium content materials (incl. about 400000 t of wastes from aluminum hydroxide production), and a pond of an area of roughly 3 ha, up to 15 m deep, with about 400000 m3 of polluted water and infiltrates from the disposal site mentioned. The basic problem related to the effluents in the Górka pond is both their high alkalinity (pH 12-13.4) and a variable analysis of pollutants whose level increases appreciably with the pond?s depth. The solution offered provides, first of all, remedial pumping and a treatment of effluents retained in the Górka reservoir. Effluents would be treated in a reverse osmosis plant according to a process verified so far on a quarter-commercial scale. The treatment process by-product, a brine solution (containing about 25% NaCl) whose amount may reach up to 100000 m3 might be supplied to the Debiensko Mine, which produces technological salt from salt-bearing mine waters. In parallel, an intake of underflows of infiltrates would be provided (previous geochemical identification) in order to take them away from the high aluminum site (by means of deep wells, and possibly girdling ditches). Such effluents would be subject to treatment. The successive stage is the utilization of approx. 50000 m3 of bottom slurry, left in the emptied reservoir, in the production of self-solidifying mixtures, which would be then used for sealing the bottom and the banks of the Górka reservoir. The empty and sealed reservoir would be filled up with a volume of approx. 600000 t of ashes, coming from coal burning in the thermal-electric power station. For the last stage, instead, is scheduled the rehabilitation of the entire waste disposal site in the Górka quarry. The site will be drained, covered with a leveling, sealing and rehabilitating layer, which will allow to introduce plants on the rehabilitated waste site. Later on, the area could be turned into a town park
Citation
APA:
(2006) Remediation Of The Abandoned Waste-Filled Marl Quarry GórkaMLA: Remediation Of The Abandoned Waste-Filled Marl Quarry Górka. Society for Mining, Metallurgy & Exploration, 2006.