Abstract
The Ardlethan tin concentrator had dete riorated considerably in metallurgical per- formance, maintenance and plant availability.  This problem was compounded by low tin prices  and International Tin Council quotas. Mid- 1976 figures were: throughput - 1300 tonnes  per day, availability 83% and metal recovery  537. Major problems existed throughout the  circuit from crushing to tailings disposal  and with morale, staffing, and housekeeping. With the lifting of the quotas in June  1976, management provided funds to implement  a major rehabilitation programme and some  fifteen major projects, at a cost of about  $1.3 million have been completed to date. The change in performance has been dram- atic, and end of 1977 performance figures are:  throughput - 1700 tonnes per day, availability  90% and metal recovery 65%.
Citation
APA: (1978) Rehabilitation of the Ardlethan Tin N.L. Concentrator
MLA: Rehabilitation of the Ardlethan Tin N.L. Concentrator. The Australasian Institute of Mining and Metallurgy, 1978.