Recent Trends of Mechanization in Copper Refining at Outokumpu Oy

- Organization:
- The Minerals, Metals and Materials Society
- Pages:
- 15
- File Size:
- 425 KB
- Publication Date:
- Jan 1, 1976
Abstract
In recent years, various renovations have been carried out in the production chain of the Outokumpu copper refinirg process. The anode casting shop, which is the final integral production section at the Harjavalta copper smelter built in its original form in 1945, was fourxl unsuitable for technical and capacity demads during longer periods of operation, and a new casting shop was built in 1974. The electrolytic copper refinery of Outokumpu Oy at Pori was built in 1941, and subsequently expanded in two stages. Even with its present limited scale of production it has been fom important to mechanize the main operations. This work was started in 1967 with the design and construction of the starting sheet machine connected with the cathode washing and unloading machine as a combined unit. Mechanized treatment of anodes has gained advantage particularly from the new design of a highly automated anode casting shop. In the further development of the mechanization a stripping machine for, starting sheets was designed and installed, starting operation in 1974.
Citation
APA:
(1976) Recent Trends of Mechanization in Copper Refining at Outokumpu OyMLA: Recent Trends of Mechanization in Copper Refining at Outokumpu Oy. The Minerals, Metals and Materials Society, 1976.