Productivity Increase At Arcelormittal Tubarao HSM *

Associacao Brasileira de Metalurgia,  Materiais e Mineracao
José Fagundes Júnior Juliano Braz Possatti
Organization:
Associacao Brasileira de Metalurgia, Materiais e Mineracao
Pages:
8
File Size:
780 KB
Publication Date:
Oct 1, 2019

Abstract

This project involved a teamwork including process control, maintenance and operation specialists, R&D and CTO experts to identify and actuate on each opportunity to increase charging temperature, furnace efficiency, decrease discharging temperature when possible, decrease FM and RM cycle time (mainly speed increase and interpass time decrease), tracking zones optimization, safe use of equipment power limits, safety interlocks revision and tune models for Mill Pacing Control and Slab Design.As result of these efforts, ArcelorMittal Tubarão HSM today occupies a prominent position among the best HSM of similar layout and produced mix of the group and worldwide. This paper will show the path which was followed by the AMT HSM team to achieve more than a 20% productivity increase resulting in a hot coils production per year more than 700 million tons higher.
Citation

APA: José Fagundes Júnior Juliano Braz Possatti  (2019)  Productivity Increase At Arcelormittal Tubarao HSM *

MLA: José Fagundes Júnior Juliano Braz Possatti Productivity Increase At Arcelormittal Tubarao HSM *. Associacao Brasileira de Metalurgia, Materiais e Mineracao, 2019.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account