Production Potential Of Miner-Bolter Continuous Mining Systems

Society for Mining, Metallurgy & Exploration
Yoginder P. Chugh
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
15
File Size:
445 KB
Publication Date:
Jan 1, 1979

Abstract

The Department of Energy is presently sponsoring the development of automated miner-bolter machines in an effort to increase production and productivity in the continuous room-and-pillar mining sections. This study is concerned with the production potential of these machines in three different mine layouts. The Underground Material Handling Simulation (UGMHS) computer model was utilized in the study. The effect of variables such as bolt installation delay, shuttle car capacity, and equipment availability on production are analyzed.
Citation

APA: Yoginder P. Chugh  (1979)  Production Potential Of Miner-Bolter Continuous Mining Systems

MLA: Yoginder P. Chugh Production Potential Of Miner-Bolter Continuous Mining Systems. Society for Mining, Metallurgy & Exploration, 1979.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account