Production - Domestic - Development of Oil and Gas in Missouri in 1944

The American Institute of Mining, Metallurgical, and Petroleum Engineers
Frank C. Greene
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
1
File Size:
36 KB
Publication Date:
Jan 1, 1945

Abstract

Drilling in Missouri in 1944 was nearly treble the rate of 1943 because of continued development of the Tarkio pool in Atchison County and the preparation of a pool in Jackson County for a water-injection project. The pipe line from the Prairie Point gas pool in Platte County was in operation throughout the year of 1944, but several of the shallow oil pools in Cass and Jackson Counties were off production during much of 1944 because of a shortage of help. Table I gives a summary of activities by counties. The total footage drilled was 41,475 .ft., of which 21,187 ft. was by rotary tools and 20,268 ft. by cable tools.
Citation

APA: Frank C. Greene  (1945)  Production - Domestic - Development of Oil and Gas in Missouri in 1944

MLA: Frank C. Greene Production - Domestic - Development of Oil and Gas in Missouri in 1944. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1945.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account