Process Plant Expansion And Operation At Round Mountain

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 6
- File Size:
- 341 KB
- Publication Date:
- Jan 1, 1990
Abstract
Echo Bay Mines Ltd. operates a gold heap leach in Round Mountain, Nevada, U.S.A. In the past two years, the mine has expanded operations from 13.5 kt/d (15 kst/d) to 41.0 kt/d (45 kst/d), making it the world's largest gold heap leach operation. The expansion is a separate system from the previous 12 year old plant, yet very similar. The flowsheet contains open circuit primary, secondary, and tertiary crushing with interstage screening. A leach pad stacker loads reusable asphalt leach pads. The process plant features carbon adsorption, pressure strip, electrowinning, and electrorefining.
Citation
APA:
(1990) Process Plant Expansion And Operation At Round MountainMLA: Process Plant Expansion And Operation At Round Mountain. Society for Mining, Metallurgy & Exploration, 1990.