Process Development For A Gold/Silver Mining-Milling Project

The American Institute of Mining, Metallurgical, and Petroleum Engineers
Robert J. Brison
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
10
File Size:
318 KB
Publication Date:
Jan 1, 1984

Abstract

On the basis of experience accumulated during the completion of some 150 gold/silver process development projects, general guidelines are presented for developing the most cost effective process for a specific project. Steps involved in process development for lode ore deposits generally include a review of pertinent background information on the ore deposit, sample procurement and preparation, sample characterization, study of concentration possibilities, investigation of leaching and metal recovery methods, economic evaluation of alternative processes, optimization of the selected process, a pilot plant program if warranted, and finally, process design and feasibility studies. Each of these steps is discussed, with emphasis on the relation between technology and economics.
Citation

APA: Robert J. Brison  (1984)  Process Development For A Gold/Silver Mining-Milling Project

MLA: Robert J. Brison Process Development For A Gold/Silver Mining-Milling Project. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1984.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account