Precast concrete liners for blind-drilled shafts

Canadian Institute of Mining, Metallurgy and Petroleum
Eric R. Skonberg
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
6
File Size:
3450 KB
Publication Date:
Jan 1, 1981

Abstract

"Technology exists today to blind drill a mine shaft 20 feet in diameter, unlined, over 3,000 feet deep. These shafts must be lined in the most economical, safe and expedient manner possible. A new technique of stacking precast concrete cylindrical sections in the unlined shaft has been developed to yield a dry and hydrostatically lined shaft .These sections must withstand an external radial pressure of 3,000 feet of water yet take up as little room as possible in the shaft . Using high-strength concrete, wall thicknesses may be kept at 2 feet. The outside diameter of the sections has been chosen to be 18 feet to allow for some annular space between the liner and shaft wall. The concrete sections are produced in segments 10 feet long weighing 75 tons each. During drilling operations, the concrete sections are cast and cured. After drilling operations are complete, a headframe is situated over the shaft. The unlined shaft remains full of fluid. A special liner running tool is mated with the section in three steel ports at the bottom of the section. The section and running tool are lowered into the hole, and the tool is disconnected and returned to the surface. Subsequent sections are lowered and stacked using the same operation. Grout is placed behind the liner to result in a dry shaft."
Citation

APA: Eric R. Skonberg  (1981)  Precast concrete liners for blind-drilled shafts

MLA: Eric R. Skonberg Precast concrete liners for blind-drilled shafts. Canadian Institute of Mining, Metallurgy and Petroleum, 1981.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account