Planning and Forecasting Stope Production

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 6
- File Size:
- 1574 KB
- Publication Date:
- Jan 1, 2014
Abstract
"In this paper a discussion is presented of a program designed to produce a 40-day production forecast for an underground stoping system.The program is intended to be a tool for the operations department in an underground mine, and is designed to utilize data readily available from production reports. Brevity of data input, ability to revise slope conditions easily and the accuracy of starting stope status are stressed. Applicability of the program to a wide variety of sloping methods makes the program potentially useful in a large number of mines.The general functions of the program subroutines, and input and output lists are discussed. An example is also given of a stope in operation for a three-day period, which shows how the program can handle production irregularities as they arise."
Citation
APA:
(2014) Planning and Forecasting Stope ProductionMLA: Planning and Forecasting Stope Production. The Southern African Institute of Mining and Metallurgy, 2014.