Phelps Dodge Hidalgo Smelter - 1992 Major Turnaround

- Organization:
- The Minerals, Metals and Materials Society
- Pages:
- 6
- File Size:
- 166 KB
- Publication Date:
- Jan 1, 1993
Abstract
During the months of April and May 1992, the Phelps Dodge Hidalgo smelter underwent a major turnaround. This was the third such turnaround in the life of the facility which was commissioned in 1976. During the third furnace campaign, the smelter processed 5.2 million tons of concentrate producing 2.6 billion pounds of anode copper over a 7.5 year period. The critical path on the fifty-nine (59) day turnaround schedule was the reconstruction of the Outokumpo flash furnace which integrated some modifications with standard rebuild practices. Modifications included incorporation of horizontal cooling jackets throughout the furnace settler as well as the installation of castable refractory in the reaction and uptake shafts.
Citation
APA:
(1993) Phelps Dodge Hidalgo Smelter - 1992 Major TurnaroundMLA: Phelps Dodge Hidalgo Smelter - 1992 Major Turnaround. The Minerals, Metals and Materials Society, 1993.