Performance and Equipment Costs in Shaker-conveyor Mining of Anthracite Coal

The American Institute of Mining, Metallurgical, and Petroleum Engineers
John Marshall
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
18
File Size:
654 KB
Publication Date:
Jan 1, 1940

Abstract

THE purpose of this paper is to present to the profession data and experience obtained over a period of 5 years in the operation of 87 shaker-conveyor units, and the production of 2,169,638 tons of run-of-mine anthracite coal. The data are not generally available and should be of interest to those concerned with the operation of anthracite and bitu-minous mines. To simplify comparison, a ton of 2000 lb. of raw run-of-mine coal has been used as the production unit throughout this paper.
Citation

APA: John Marshall  (1940)  Performance and Equipment Costs in Shaker-conveyor Mining of Anthracite Coal

MLA: John Marshall Performance and Equipment Costs in Shaker-conveyor Mining of Anthracite Coal. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1940.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account