Performance and Equipment Costs in Shaker-conveyor Mining of Anthracite Coal

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 18
- File Size:
- 654 KB
- Publication Date:
- Jan 1, 1940
Abstract
THE purpose of this paper is to present to the profession data and experience obtained over a period of 5 years in the operation of 87 shaker-conveyor units, and the production of 2,169,638 tons of run-of-mine anthracite coal. The data are not generally available and should be of interest to those concerned with the operation of anthracite and bitu-minous mines. To simplify comparison, a ton of 2000 lb. of raw run-of-mine coal has been used as the production unit throughout this paper.
Citation
APA:
(1940) Performance and Equipment Costs in Shaker-conveyor Mining of Anthracite CoalMLA: Performance and Equipment Costs in Shaker-conveyor Mining of Anthracite Coal. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1940.