Pawtucket CSO Tunnel Design Build—Construction Project Updates - NAT2024

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 677 KB
- Publication Date:
- Jun 23, 2024
Abstract
The Narragansett Bay Commission Phase III CSO Program includes construction of the
11,600-foot long, 30-foot ID, deep rock Pawtucket Tunnel in Rhode Island. This paper provides an overview
of the Design Build Project features and highlight some of the important design considerations, features,
and innovations, including geologic conditions and related TBM design, and deep shaft and tunnel segment
designs. The paper provides the most recent updates on some of the project construction activities including
TBM tunnel progress and retrieval schemes, tunnel pump station and deep vertical shaft liner installations,
SEM construction, and microtunneling for the longest adit using Fiberglass Reinforced Polymer Mortar pipes.