Papers - Development - Driving a Tunnel in Fractured Rock Formation Carrying Water under High Static Pressure (Mining Technology, Nov. 1942)

The American Institute of Mining, Metallurgical, and Petroleum Engineers
S. H. Ash P. S. Miller
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
16
File Size:
1148 KB
Publication Date:
Jan 1, 1943

Abstract

Extensive and diversified resources justify large populations and great industries. To carry on the business of commerce and meet the demands of large populations, the utilization of tunnels in some form for transportation purposes constitutes an important link in modern civilization. The driving of tunnels has been appropriated by the tunneling branch of the heavy-construction industry, and the progressive steps taken by modern tunnel builders were not even dreamed of 50 years ago. Great strides have been made toward more rapid progress in tunneling in the United States during the past I0 years. Tunneling consists of a definite cycle of operations developed from ideas that are crystallized and translated into action programs through various engineering phases that begin with the first preliminary survey and do not end until the job is completed. Once the line of the bore is established and a time set for the completion of the work, the face must advance according to estimates prepared before the work commences. This schedule must be followed in regular sequence from the moment the drills start against a new face of rock until they are ready again to drill the Succdeding face, constituting a round. Mining is largely tunneling carried on under conditions often more inherently hazardous than actual tunnel construction, but for various reasons" tunne1ing is more hazardous than mining in any branch of the mineral industry. On the other hand, obstacles are sometimes encountered in heavy-construction tunneling projects that when met in mining enterprises do not offer comparable tasks to avoid or overcome them. One is the existence of water under high pressures. In mining enterprises, various alternatives offer a solution in driving a tunnel, even to the extent of its discontinuance or the abandonment of the mine, but a "construction" tunnel usually must go forward because some important project depends largely if not entirely upon it. This paper describes an unusual method of driving a water-supply tunnel through rock carrying water under pressures and conditions that did not permit the use of ordinary tunneling methods. The Delaware Aqueduct The new Delaware aqueduct is a Manhattan project of some magnitude; when regular it will contain what probably will be, for some time to come, the longest tunnel in the world. Various features in its construction are currently described in the trade journals of the construction industry, and informative engineering details are given in the Delaware Water Supply News, published twice a month by the Board of Water Supply of the City of New York. Work was begun on this project on March 24, 1937. The tunnel will convey water from reservoirs at the headwaters of the Delaware River to the City of New York.
Citation

APA: S. H. Ash P. S. Miller  (1943)  Papers - Development - Driving a Tunnel in Fractured Rock Formation Carrying Water under High Static Pressure (Mining Technology, Nov. 1942)

MLA: S. H. Ash P. S. Miller Papers - Development - Driving a Tunnel in Fractured Rock Formation Carrying Water under High Static Pressure (Mining Technology, Nov. 1942). The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1943.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account