Ore Preparation

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 2
- File Size:
- 217 KB
- Publication Date:
- Jan 11, 1953
Abstract
The Pueblo plant receives its principal supply of iron ore from the Sunrise mine, located in Platte County, Wyo., and Iron Mountain, southwest of Cedar City, Utah. Limestone from Monarch quarry located on the continental divide above Salida, Colo., is shipped into Pueblo to be used as a flux. Of importance to the successful operation of the blast furnace plant is the ore preparation unit at Pueblo. Due to the geologic structure of both the Utah and Wyoming deposits, the ores, both high in grade, are quite variable in chemical and physical nature.
Citation
APA: (1953) Ore Preparation
MLA: Ore Preparation. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1953.