Optimizing Truck-Loader Matching Using Fleet Production And Cost To Optimize Truck-Loader Match

Society for Mining, Metallurgy & Exploration
D. Gove
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
11
File Size:
636 KB
Publication Date:
Jan 1, 1994

Abstract

All mining operations using trucks have a common need to properly match the number and size of hauling units (trucks. wagons. scrapers. etc.) to a loading unit (wheel loader. hydraulic shovel/excavator, cable shovel. push tractor. etc.) to provide the best possible fleet match. Optimizing fleet match minimizes the cost per unit of material moved by that fleet. As haul conditions change (haul length. grade. or rolling resistance), there may be need to adjust the number of trucks to maintain the optimum fleet match. Fleet Production and Cost is a tool which, among other things, can be used to optimize the truck-loader match.
Citation

APA: D. Gove  (1994)  Optimizing Truck-Loader Matching Using Fleet Production And Cost To Optimize Truck-Loader Match

MLA: D. Gove Optimizing Truck-Loader Matching Using Fleet Production And Cost To Optimize Truck-Loader Match. Society for Mining, Metallurgy & Exploration, 1994.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account