Optimization of comminution circuit and mine-plant integration at Cerro Corona

- Organization:
- International Mineral Processing Congress
- Pages:
- 1
- File Size:
- 296 KB
- Publication Date:
- Jan 1, 2014
Abstract
"Cerro Corona is a porphyry ore with different geometallurgical units and alterations produced by an extensive family of geological failures that have determined a special type of mineralization. With the increasing depth of the mine, it is estimated that the host rock will be less altered. Consequently, the ore will have a higher resistance to breakage accompanied by associated problems such as lower throughput. In light of this reality, various projects have been carried out with the objective to optimize mineral processing of ore with low clay content and high hardness, including reducing the blasting grid, increasing the load factor, using adequate mixtures of hard ore, reducing crusher settings, installing air guns in the transfer chutes, increasing ball charge, and changes in the lifter design, wear control in the hydrocyclones, syntonization of control logics, supervisor control of the SAG mil, characterization of feed ore, etc. However the most important factor was the teamwork between mine and plant personnel, aiming at common objectives for the company. These projects started in 2011, including characterization of mineralogical domains, breakage and blasting characteristics, and also a revision of the actual operating conditions in the crushing and grinding circuit. The development of different designs of the SAG mill lifters and the unloading grates, a 16% ball charge increase, improvements in the blasting process, reduction of the primary crusher setting, weight reduction on the feed lid, and variation of operational parameters, all allowed the company to achieve its objectives of maintaining impact control and steel recharge within the expected operational parameters. The achieved throughput is above design capacity, sustainable, and not without new challenges for maintaining and optimizing this production level."
Citation
APA:
(2014) Optimization of comminution circuit and mine-plant integration at Cerro CoronaMLA: Optimization of comminution circuit and mine-plant integration at Cerro Corona. International Mineral Processing Congress, 2014.