Optimal planning of extracting works at the quarries of non-ferrous metallurgy of Kazakstan

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 6
- File Size:
- 119 KB
- Publication Date:
- Jan 1, 2003
Abstract
Almost all the ore deposits of ferrous, non-ferrous and rare metals of Kazakstan, are exploiting by the open-cast method, are the complex-structural, multi-component ones. Their rational working requires precise organization of extracting works. In this connection it is necessary to set up the best intercommunications between drilling-blasting, excavating-loading and transport works. This requires the stable functioning of the quarry for dispatch of ore raw material of required quality with minimum of corresponding expenses. For this purpose, proceeding from the quarry’s ore output and the assumed parameters of the exploitation system, the first problem about rational arrangement of excavating-loading equipment in extracting faces is solved. By solving the problem the model with dynamic, adapting properties had been used. It was solved numerically by the method of statistical tests. By setting up the necessary link between type-sizes of excavating-loading and transport equipment, the minimum prime cost of loading and transportation of 1 ton of mining mass from the face to the receiving station was adopted as the criterion of optimality. Depending on the type of excavating-loading equipment, the efficiency function may be different. By using wheel loaders, their displacement between the faces is possible, therefore, the efficiency function of the problem may include expenses for their displacement. By using excavators like power shovel, the problem’s restrictions must exclude its displacement between the faces. The efficiency function consists of minimum expenses for loading, proceeding from set of volumes of extraction from the faces, satisfying required quality. The volumes of extraction from the faces, satisfying required quality of ore in output stream, are determined by the method of statistical tests. Sample range is given, proceeding from the restrictions for maximum productivity of the excavating-loading equipment. Volumes of extraction, not satisfying required quality, are cut off. The efficiency function meaning is then determined and minimized. Keywords: Excavating-loading equipment, its placing in extracting faces, optimal load-carrying capacity, specific expenses for loading and transportation of mining mass.
Citation
APA:
(2003) Optimal planning of extracting works at the quarries of non-ferrous metallurgy of KazakstanMLA: Optimal planning of extracting works at the quarries of non-ferrous metallurgy of Kazakstan. The Southern African Institute of Mining and Metallurgy, 2003.