Operating Experience at the Malmberget Straight Grate Pelletizing Plant

The American Institute of Mining, Metallurgical, and Petroleum Engineers
R. R. Odman O. N. Lofgren
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
5
File Size:
263 KB
Publication Date:
Jan 1, 1983

Abstract

At the planning stage for this plant it was scheduled that the plant operate at a low energy consumption. After start up in 1973 it was established that outcome was even better than the forecast. In view of the 1977 ore market it was decided to operate the plant at half capacity. This initiated efforts to reoptimize the process in order to hold back expected increase in energy consumption. The result from this work proves that a detailed study and tuning of the process can not only avoid expected increase, but also reduce specific energy consumption.
Citation

APA: R. R. Odman O. N. Lofgren  (1983)  Operating Experience at the Malmberget Straight Grate Pelletizing Plant

MLA: R. R. Odman O. N. Lofgren Operating Experience at the Malmberget Straight Grate Pelletizing Plant. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1983.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account