OFR-10(3)-79 Noise Control Modification Manual - Jeffrey 94-L Bridge Conveyor

The National Institute for Occupational Safety and Health (NIOSH)
Tom Retka
Organization:
The National Institute for Occupational Safety and Health (NIOSH)
Pages:
37
File Size:
9357 KB
Publication Date:
Jan 1, 1978

Abstract

This three volume final report summarizes the activities and conclusions of this contract. The objective of the contract was to develop noise control modifications on a retrofit basis, for auger miner coal-cutting systems. Manuals were prepared to assist mine shop personnel in retrofitting the auger miner with these noise controls. Final Report Volume I - Details all vibration and acoustical tests conducted in development of the noise controls. Final Report Volume II - Noise Control Modification Manual for the Jeffrey 100-L Auger Miner describes the various noise control modifications to the auger miner, along with fabrication procedures, cost and vendor information. Final Report Volume III - Noise Control Modification Manual for the Jeffrey 94-L Bridge Conveyor describes the various noise control modifications to the bridge conveyor, along with fabrication procedures, cost and vendor information.
Citation

APA: Tom Retka  (1978)  OFR-10(3)-79 Noise Control Modification Manual - Jeffrey 94-L Bridge Conveyor

MLA: Tom Retka OFR-10(3)-79 Noise Control Modification Manual - Jeffrey 94-L Bridge Conveyor. The National Institute for Occupational Safety and Health (NIOSH), 1978.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account