Notes on the Delayed Method of Stope Filling at Mount Isa Mines Limited

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
36
File Size:
1337 KB
Publication Date:
Jan 1, 1953

Abstract

Introduction.History of Stope Filling at Mount Isa.The Need for a Systematic Fill Programme.Reasons for Filling.Fill Materials and Tonnages.Rough Mullock Fill.Quantities Readily Available.Fill Pass Development.Stope Preparation.Drainage.Hydraulic Sand Fill.Initial Experiments with Mill Tailings.Surface Layout.Operation Procedure.Underground Pipe Lines.Life of Sand Pipes and Cones.Drainage.Old Tailings Dam Sands.Quantity of Fill Placed.Pillar Tonnages.Conclusion and Acknowledgment.INTRODUCTIONFilling practice outlined in this paper refers exclusively to the Black Star section of the mine. The stope filling necessary early in the life of the Black Rock and portions of the Rio Grande sections is not to be confused with the current filling programme.
Citation

APA:  (1953)  Notes on the Delayed Method of Stope Filling at Mount Isa Mines Limited

MLA: Notes on the Delayed Method of Stope Filling at Mount Isa Mines Limited. The Australasian Institute of Mining and Metallurgy, 1953.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account