Nice—Tramway T2: A Success Story in Unusual Ground Conditions - RETC2023

Society for Mining, Metallurgy & Exploration
Guillaume Roux Raoul Fernandez Bernard Catalano
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
11
File Size:
190 KB
Publication Date:
Jun 13, 2023

Abstract

The Thaumasia Joint-Venture, composed of Bouygues Travaux Publics, Soletanche- Bachy and Bessac, completed the construction of the underground section of line 2 of the Nice tramway, which comprised a 3.2 km twin track tunnel and four underground stations, in a particularly complex urban and geotechnical context. The density of the surface structures, as well as the presence of many historic buildings on its route made the construction of the tunnel even more sensitive, with a settlement threshold of Half an Inch. The joint venture faced a complex subsoil, varying from one extreme to another from highly plastic clay layers to fibrous peat and to cobbles with very high permeability, with artesian ground water, and with unforeseen anthropogenic obstacles in the tunnel section Due to the diversity of the problems encountered and their variability over short distances, the construction of the underground section of the Nice tramway, in its very sensitive urban context, undeniably constituted an unprecedented challenge.
Citation

APA: Guillaume Roux Raoul Fernandez Bernard Catalano  (2023)  Nice—Tramway T2: A Success Story in Unusual Ground Conditions - RETC2023

MLA: Guillaume Roux Raoul Fernandez Bernard Catalano Nice—Tramway T2: A Success Story in Unusual Ground Conditions - RETC2023. Society for Mining, Metallurgy & Exploration, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account