New Water Supply—Oslo - RETC2023

Society for Mining, Metallurgy & Exploration
Silje M. Tinderholt Ingunn Opland
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
16
File Size:
256 KB
Publication Date:
Jun 13, 2023

Abstract

Drill and blast project in Norway’s capital. The contract consists of 7 rock caverns (350–950 m2), 9.2 km tunnels, and four shafts. With 110 blue-collar and 31 white-collar, the project produces an average of 16–21,000 m3 hard rock per week, with a total of 19 tunnel faces. Weekly, nine grouting rounds for water control, 800 m3 shotcrete, and 1,200 bolts are required, and 60 trucks leave the site pr. day. Challenges include blasting in densely populated areas, planning and coordination to maintain high production, obtaining a CEEQUAL certification of very good, and transporting rock on Oslo’s main highway.
Citation

APA: Silje M. Tinderholt Ingunn Opland  (2023)  New Water Supply—Oslo - RETC2023

MLA: Silje M. Tinderholt Ingunn Opland New Water Supply—Oslo - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account