New Reverberatory Waste-heat Boiler and Power Plant at Douglas Smelter

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 16
- File Size:
- 768 KB
- Publication Date:
- Jan 1, 1939
Abstract
DURING the past few years a number of improvements in smelting and power equipment have been made at the Douglas smelter of the FIG. 1.-GENERAL PLAN OF SMELTER. Phelps Dodge Corporation at Douglas, Ariz. In the summer of 1935 work was started on the first unit of a new reverberatory waste-heat boiler plant which ultimately was to furnish steam for a modern high-pressure power plant. A second reverberatory waste-heat boiler unit