New Reverberatory Waste-heat Boiler and Power Plant at Douglas Smelter

The American Institute of Mining, Metallurgical, and Petroleum Engineers
L. L. McDaniel
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
16
File Size:
768 KB
Publication Date:
Jan 1, 1939

Abstract

DURING the past few years a number of improvements in smelting and power equipment have been made at the Douglas smelter of the FIG. 1.-GENERAL PLAN OF SMELTER. Phelps Dodge Corporation at Douglas, Ariz. In the summer of 1935 work was started on the first unit of a new reverberatory waste-heat boiler plant which ultimately was to furnish steam for a modern high-pressure power plant. A second reverberatory waste-heat boiler unit
Citation

APA: L. L. McDaniel  (1939)  New Reverberatory Waste-heat Boiler and Power Plant at Douglas Smelter

MLA: L. L. McDaniel New Reverberatory Waste-heat Boiler and Power Plant at Douglas Smelter. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1939.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account