New Design for a 10 M Universal Double Shield TBM for Long Railway Tunnels in Critical and Varying Rock Conditions

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 3745 KB
- Publication Date:
- Jan 1, 2003
Abstract
Current extensions of the European railway network require long TBM drives in the diameter range of 10 m under critical and varying rock conditions. In view of that and in particular for a 7 km long high-speed railway tunnel in Spain to be started in mid-2003 a new design for a hard rock Double Shield TBM has been developed by SELI (Italy) and Jäger (Austria) in collaboration with Mitsubishi (Japan)and Robbins (USA). Due to the new design and operational features that new type of TBM has been named Universal Double Shield TBM with a further extended area of application. Special attention has been given to outstanding torque and thrust capacities combined with the shortest possible length of an innovative shield arrangement, different advance modes in various ground conditions and further developed exploration and treatment facilities.
Citation
APA:
(2003) New Design for a 10 M Universal Double Shield TBM for Long Railway Tunnels in Critical and Varying Rock ConditionsMLA: New Design for a 10 M Universal Double Shield TBM for Long Railway Tunnels in Critical and Varying Rock Conditions. Society for Mining, Metallurgy & Exploration, 2003.