Mine Ventilation Aspects Of The Expansion Of Rio Algom's Uranium Mining Operations In Elliot Lake

Society for Mining, Metallurgy & Exploration
A. R. Bell
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
570 KB
Publication Date:
Jan 1, 1980

Abstract

Rio Algom Limited are currently undergoing a major expansion of their mining operations in the Elliot Lake area. To date this has involved the increase of output at the Quirke Mine from 4080 to 6350 tonnes per mill day (4500 to 7000 tons), the rehabilitation of the Panel Mine to produce at the rate of 2990 tonnes per mill day (3300 tons) by 1980, and the rehabilitation of the Stanleigh Mine to produce 4540 tonnes per mill day (5000 tons) by 1984. In addition, the planning for the rehabilitation of the Milliken Mine to produce 4990 tonnes per mill day (5500 tons) is now underway. This major expansion is taking place at a time of increasing awareness of occupational health matters and has involved very high capital expenditures and detailed planning related to the ventilation system to endeavour the provision of an acceptable environment. The paper discusses the ventilation systems, established and proposed, and relates them to historical and current data on mine air contaminants.
Citation

APA: A. R. Bell  (1980)  Mine Ventilation Aspects Of The Expansion Of Rio Algom's Uranium Mining Operations In Elliot Lake

MLA: A. R. Bell Mine Ventilation Aspects Of The Expansion Of Rio Algom's Uranium Mining Operations In Elliot Lake. Society for Mining, Metallurgy & Exploration, 1980.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account