The Bureau of Mines in cooperation with Kaiser  Steel Corporation conducted two methane drainage  studies in an advancing section of the Sunnyside No. I  Mine where production was being severely hampered  by methane emissions. A total of six horizontal  aoreholes were completed during the studies to an  average length of 291 meters. Total gas production  from the boreholes as of December 1981 has  exceeded 6,088,800 m3. Methane emissions into the  section were reduced by 40 pct as a result of the first  drainage system. The second drainage system is currently producing 11,328 m3/day from four  Doreholes. Mining of the section and cementing of  the horizontal horeholes is expected to begin within 2  Years.
Citation
APA: (1982) Methane Drainage Experience with Horizontal Boreholes in a Western Coalbed
MLA: Methane Drainage Experience with Horizontal Boreholes in a Western Coalbed. The Australasian Institute of Mining and Metallurgy, 1982.