THE Tri-State Zinc, Inc., Galena, Ill., was confronted with the problem of securing ore from a deposit because the hoisting shaft was several thousand feet from the mill. The orebody is several thousand feet long, averaging 200 ft in width and 60 ft in height and opened up by vertical shafts some 300 ft deep. Mining is by the room-and-pillar method. During the initial operation the ore was loaded by conventional electric 1/2-yd boom-and-dipper shovels and hauled to the shaft by 8-ton diesel trucks. This underground ore loading and hauling was well adapted to the conditions and productive of low costs per ton. However, with the mill situated as mentioned, a triple handling of all broken rock was necessary: l—from the stope to the shaft by truck, 2—up the shaft by skip br can into the surface hopper, and 3—by truck from the surface hopper to the crushing plant at the mill. In addition to the repeated handling, serious troubles were encountered during the winter because of freezing in the shaft hopper. Consideration was given to either moving the mill to the new orebody or to the construction of a second mill. The presence of other orebodies to be mined at a later date made the first alternative impractical while the capital outlay for a second mill, when the present plant of approximately 850 tons per day was deemed sufficiently large for the total reserves, made the second alternative also unwise. It was decided to retain the mill in the originals location and continue to move the ore to it. The idea of driving an inclined adit from the surface to the bottom of the orebody suitable for truck haulage and big enough to allow the passage of all mechanical equipment was conceived. Among the apparent advantages of such an incline were: 1— Direct haulage from the stope to the mill without rehandling. 2—Elimination of virtually all grizzlies. Trucking from underground to the mill would do away with all hoppers, chutes, gates, and skips and make the maximum rock size dependent solely on the size of the shovel dipper at the mine and the crusher opening at the mill. 3—Less secondary blasting would be needed. 4—Ease of transporting equipment and supplies underground. Shovels and trucks could be taken through the incline intact. 5—Equipment could be brought to the surface for repairs and servicing without loss of time. The same advantages of ease in moving would be present in the handling of men, steel, powder, and supplies. 6—There would be far less difficulty in increasing the amount of tonnage that could be moved by truck up an incline than would be found in attempting to increase the capacity of a shaft. 7—All the broken ore in the stopes would serve as bin capacity, as it would take the breakdown of all of the loading and hauling equipment to have the same effect as a delay in shaft hoisting. 8—All danger of men being trapped in the mine as a result of shaft fire or power stoppage would be eliminated. 9— Virtually all trouble from severe winter conditions would be eliminated by the direct haul underground to the mill. The decision was made to proceed with the driving of an inclined adit. The topography of the surface between the orebody and the mill was such that it was possible to locate the portal at a point 170 ft above the mine floor and 1800 ft horizontally from the central point of the orebody to the south and 2500 ft from the mill to the north. A grade of 10 pct was found to be optimum for continuous truck haulage when the various factors of speed, safety, and truck maintenance were all considered. The incline as driven was consequently 1700 ft long on 10 pct grade and 12 ft high by 17 ft wide in cross section. The tunnel-driving equipment was chosen so that it could be used in mining after the completion of the tunnel. Drilling was done with a jumbo with two Joy jibs mounting 3-in. drills, loading with an Allis-Chalmers diesel-powered, front-end loader of approximately 11/4-yd capacity, and hauling by Koehring Dumptor trucks of 8-ton capacity, diesel-powered. The width of the tunnel allowed the end loader and Dumptor to be placed abreast. Since the Dumptors can be driven either forward or backward with equal facility, loading was accomplished without turning around either machine throughout the loading operation. The crew in addition to the tunnel foreman was comprised of three men per shift at the start and in the later work, four men. Each crew could perform any part of the working cycle. If the drilling was completed and the round blasted in the middle of a shift, the same men would proceed with the loading and hauling. Since the mine already had been drained to the bottom levels, no water was encountered. At the halfway point the tunnel was widened for approximately 100 ft to permit trucks to pass. The total cost of the tunnel excluding the capital outlay for equipment, which was all continued in use in the subsequent mine operation, was $60,363.00 or $35.50 per ft. The tunnel was completed at the end of June, 1949 and has been in continuous use since that time. In the five months from July to November inclusive, 106,049 tons have been transported to the mill or an average of 835 tons per day. No unforeseen disadvantages have been encountered and the advantages which had been predicated before the adit's construction have been more than realized. As previously mentioned, the deposit is worked by the room-and-pillar system with occasional faces up to 125 ft high. Except in driving development drifts when diesel-powered, front-end loaders such as were used in the tunnel are employed, all shoveling is done by Yz-yd boom-dipper type shovels electrically driven. These units need a width of 25 ft and a height of 14 ft in which to operate. All hauling is by diesel trucks, mainly Koehring Dump-tors. Roads are maintained with caterpillar tractors and a road grader. The tonnage output from the
Citation

APA: V. C. Allen  (1952)  Metal Mining - Diesel Truck Haulage Through Inclined Adit

MLA: V. C. Allen Metal Mining - Diesel Truck Haulage Through Inclined Adit. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1952.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account