Metal Mining - A New Incline in the Metaline District

The American Institute of Mining, Metallurgical, and Petroleum Engineers
Chas. A. R. Lambly
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
4
File Size:
332 KB
Publication Date:
Jan 1, 1950

Abstract

In the extreme northeast corner of the State of Washington, on the Canadian border, lies the Metaline mining district. This district is old in history, but young in production. Geology The Metaline district is a zinc-lead area of the replacement type in dolomite and limestone. The ore bodies of the Josephine horizon are in many ways similar to the ore bodies of the famous Tri-State zinc fields. The beds are faulted and folded and have varying low dips in varying directions, and underlie large areas of the district. History Production started in 1927 on a very limited basis. The property is now mining and milling 700 tons per day. The mine is opened by adit tunnels and a vertical shaft. As the ore horizons gained depth, it was necessary to sink inclines to follow the ore horizon (see Fig 1). From 1927 to date, approximately 600,000 ft of diamond drill was put down This work indicated that suficient tonnage existed to justify a redesigning of the whole operation, surface and underground. After four years of general study, the following program was planned: 1. A new mine entrance, which would be an incline, that could follow the ore body down at whatever pitch was necessary. The incline will be equipped with conveyors for the moving of ore and waste to the surface and with tractor-type locomotives for man and supply transportation. 2. The new incline also required a new type of mining which was developed and is now in use. It is called contour mining and will be described in a future paper. 3. The new incline exit would necessitate the moving of the mill and mine shops across the Pend Oreille River. This part of the program is now underway. The Incline The sinking of the incline was to start as soon as World War II ended and was as follows: The first leg of the incline was to be sunk from the surface 1600 ft on a 17" slope. The collar and first level at elevation 2180 ft, the second level at elevation 2000 ft, the third level at elevation 1875 ft, and the fourth level at elevation 1700 feet. From the 1700 ft elevation the incline was to flatten out to 12" for 400 ft to give the necessary depth for the ore pockets below the 1700 ft level and the necessary clearance for future sinking (see Fig 1 and 2). Due to lack of manpower in 1946, the program was changed and was as follows: A drift was driven from the old mine workings on the 1700 ft elevation in an easterly direction. At 1300 ft the drift was turned N 50" E and at this point a raise was driven 180 ft on a 50" slope. This raise intersected the Josephine horizon and commercial ore was encountered. At the 2000 ft mark, a main raise was driven, 245 ft on a 50" slope, and the 1875 ft elevation was cut. Exploration drifts were started on this level and production followed on a limited basis. The main drift at the 2500 ft point was turned N 35" E and ran parallel to and 10 ft east of and under the proposed incline line. At the proposed intersection of the drift and incline on the 1700 ft elevation, it was planned to raise the incline to intersect the 245 ft raise and to continue on to the surface, a distance of 1600 ft. When this proposed intersection point was reached, a heavy flow of water, approximately 800 gpm, was encountered and all work on the main drift face was stopped. This water flow flooded the main pump station in the old mine and the two lower levels with approximately 20,000,000 gal of water. The water was controlled and finally drained from the cave areas and lower levels after six months of pumping. After the heavy flow of water was encountered in the main heading, it was decided that the incline would have to be started from the surface, as originally planned, so that too much time would not be lost. The surface overburden had to be removed, a total of 6000 yards. A temporary dry house for 6 men was built. An 8 in. churn drill hole was intersected in the first raise driven from the 1700 foot elevation tunnel. Air and water lines were placed in this hole, and air and water were delivered to the collar of the incline from the mine working. The incline started down at 15 ft wide and 7 ft high through the Leadbetter slates. After sinking 4 sets, it was
Citation

APA: Chas. A. R. Lambly  (1950)  Metal Mining - A New Incline in the Metaline District

MLA: Chas. A. R. Lambly Metal Mining - A New Incline in the Metaline District. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1950.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account