Matching Los Bronces Mine To Mill System Capacities Through Computer Simulation

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 455 KB
- Publication Date:
- Jan 1, 1981
Abstract
In Exxon's Los Bronces Expansion Project in Chile, a stochastic simulation is performed to resolve the complex decision problem of matching the mine to mill system capacities from both technical and economic standpoints. The unique combination of weather conditions at the mine and the 30-km belt conveyor network for ore transport to the mill necessitates this analysis in the planning phase to optimize the design capacity of the sys tem. Appropriate statistical distributions of major equipment performance, snow storm duration, power outage, etc, ate developed from actual mine local records and manufacturers specifications. The interactions of operational constraints including ore storage capacities, number and sizes of individual equipment, ore variations, and mine and mill production rates are studied more realistically than in a traditional planning approach. Details of the computer modeling and typical results of simulation studies are discussed.
Citation
APA:
(1981) Matching Los Bronces Mine To Mill System Capacities Through Computer SimulationMLA: Matching Los Bronces Mine To Mill System Capacities Through Computer Simulation. Society for Mining, Metallurgy & Exploration, 1981.