In 1997, Central Contra Costa Sanitary District undertook the design of the Martinez East Side Trunk Sewer Improvements Project. Microtunneling was specified for approximately 1,035 meters (3,400 feet) of 600-mm (24-inch)diameter pipeline to be installed through estuarine soil deposits (San Francisco Bay Mud) and alluvium beneath the congested city streets of downtown Martinez, California. Directional drilling was specified for approximately 275 meters (900feet) of 200-mm (8-inch) diameter pipeline in four separate segments to be drilled through bedrock within narrow utility easements between residential properties. This paper presents a case history for the design and construction of themicrotunneling and directional drilling aspects of the project.
Citation
APA:
(1999) Martinez East Side Trunk Sewer Microtunnelling Through Bay Mud Directional Drilling Through BedrockMLA: Martinez East Side Trunk Sewer Microtunnelling Through Bay Mud Directional Drilling Through Bedrock. Society for Mining, Metallurgy & Exploration, 1999.