Martinez East Side Trunk Sewer Microtunnelling Through Bay Mud Directional Drilling Through Bedrock

Society for Mining, Metallurgy & Exploration
David C. Mathy Kent VonAspern Curt Swanson Dru R. Nielson
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
22
File Size:
22690 KB
Publication Date:
Jan 1, 1999

Abstract

In 1997, Central Contra Costa Sanitary District undertook the design of the Martinez East Side Trunk Sewer Improvements Project. Microtunneling was specified for approximately 1,035 meters (3,400 feet) of 600-mm (24-inch)diameter pipeline to be installed through estuarine soil deposits (San Francisco Bay Mud) and alluvium beneath the congested city streets of downtown Martinez, California. Directional drilling was specified for approximately 275 meters (900feet) of 200-mm (8-inch) diameter pipeline in four separate segments to be drilled through bedrock within narrow utility easements between residential properties. This paper presents a case history for the design and construction of themicrotunneling and directional drilling aspects of the project.
Citation

APA: David C. Mathy Kent VonAspern Curt Swanson Dru R. Nielson  (1999)  Martinez East Side Trunk Sewer Microtunnelling Through Bay Mud Directional Drilling Through Bedrock

MLA: David C. Mathy Kent VonAspern Curt Swanson Dru R. Nielson Martinez East Side Trunk Sewer Microtunnelling Through Bay Mud Directional Drilling Through Bedrock. Society for Mining, Metallurgy & Exploration, 1999.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account