Management cost control at Fording Coal Limited's Genesee Operations

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 6
- File Size:
- 4133 KB
- Publication Date:
- Jan 1, 1994
Abstract
"IntroductionGeneralThe Genesee Coal Mine is a joint venture of Fording Coal Limited and the city of Edmonton. The mine supplies thermal coal to the Genesee Generating Station operated by Edmonton Power and is located approximately 75 km southwest of Edmonton (Fig. I).Under the terms of the joint venture agreement, Fording Coal Limited has designed and developed the Genesee Coal Mine. Fording also operates the mine which has a minimum economic life of thirty-five years. Mine development started in the spring of 1987 with the construction of the dragline erection pad and mine service complex. Major development of mining areas was carried out in 1988 with the construction of haul roads, powerlines, topsoil recovery, etc. Mining officially commenced on December 14,1988.The mine produces 1.6 million tonnes of coal per year and employs 65 people. MiningGround conditions have turned out to be very poor, as expected with the majority of the overburden in the first few years a soft lacustrine clay with minor amounts of fine-grained glacial till. To compound matters, what was expected to be a relatively uniform coal subcrop turned out to be a very irregular erosional contact.The coal mined at Genesee is a sub-bituminous Class B thermal coal with approximately 16070 ash, 21% moisture, 8300 Btu/lb and 0.27% sulphur on an as-mined basis.The primary piece of mining equipment used at the Genesee Coal Mine is a M8200 walking dragline. It has an effective operating radius of 100.6 m, a 50.5 m3 bucket, and weighs approximately 3860 tonnes yielding a ground pressure of III KN/m2•Figure 2 illustrates schematically the single pass mining sequence presently employed at the Genesee Coal Mine. The M8200 is used to lift all coal out of the cut, the coal being placed in stockpiles on the prepared pad .This method maximizes coal recovery under the conditions where spoil failures due to poor material would otherwise put men and equipment at risk. The coal is subsequently loaded by the coal shovel operating on the same bench as the M8200 dragline and delivered to the plant as required.All mined areas, as required under Alberta Legislation, are to be returned to an agricultural land capability equal to or better than that which existed prior to mining. Reclamation activities, as a result, are an important and integral part of the mining process. A complete list of the primary mining equipment deployed at the Genesee Operations appears in Table I."
Citation
APA:
(1994) Management cost control at Fording Coal Limited's Genesee OperationsMLA: Management cost control at Fording Coal Limited's Genesee Operations. Canadian Institute of Mining, Metallurgy and Petroleum, 1994.