Maintenance Considerations in the Design of a New Plant (Part 2)

The American Institute of Mining, Metallurgical, and Petroleum Engineers
John W. Rushton
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
3
File Size:
187 KB
Publication Date:
Jan 4, 1978

Abstract

This month's article concludes the series with maintenance design considerations in secondary crushing, grinding, and flotation circuits.
Citation

APA: John W. Rushton  (1978)  Maintenance Considerations in the Design of a New Plant (Part 2)

MLA: John W. Rushton Maintenance Considerations in the Design of a New Plant (Part 2). The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1978.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account