Magnetite Mining And Milling

The American Institute of Mining, Metallurgical, and Petroleum Engineers
J. R. Linney
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
2
File Size:
414 KB
Publication Date:
Jan 1, 1949

Abstract

Demand for eastern magnetite in 1948 necessitated practically all eastern magnetite industries to operate on a six-day week, with the result that over 11,000,000 long tons of crude ore were mined, and the shipping products amounted to approximately 5,000,. 000 long tons. Reports indicate that operating on a six-day week and doing maintenance work on the seventh day was satisfactory and resulted in excellent continuity of operation. In the Port Henry district, Republic Steel Corp. once again set new all-time records for the production of crude ore and total shipping product; 1,868,000 long tons of crude ore were mined, 945,000 from the Old Bed mine, 408,500 from the Harmony mine, and 514,500 from the Fisher Hill mine. Of the 969,000 long tons of shipping products, 663,800 long tons were sinter, 181,000 lump ore, and 115,200 con¬centrates.
Citation

APA: J. R. Linney  (1949)  Magnetite Mining And Milling

MLA: J. R. Linney Magnetite Mining And Milling. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1949.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account