LTA 219 Project: Multiple Unique Tunneling Solutions in One Subway Package in Singapore - NAT2024

Society for Mining, Metallurgy & Exploration
Yann Rouillard Alix Thierart Bernard Catalano
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
13
File Size:
997 KB
Publication Date:
Jun 23, 2024

Abstract

Bessac's presence in Singapore started in 2014 with the construction of the Thomson metro line, which includes 18 miles of twin-bore tunnels and 22 stations split into 17 construction packages. Bessac joint venture was allotted the T219 lot. The works include the construction of a new 660-foot (200-meter) long transfer station, two parallel 19-foot (5.8 m) ID tunnels and a pedestrian underpass. The urban context and the very soft ground stratum imposed to utilize unusual tunneling techniques, from upgrading a slurry TBM to a high-density slurry TBM to launch with very low cover and canopy pipe roofing completed with a MTBM without retrieval shaft.
Citation

APA: Yann Rouillard Alix Thierart Bernard Catalano  (2024)  LTA 219 Project: Multiple Unique Tunneling Solutions in One Subway Package in Singapore - NAT2024

MLA: Yann Rouillard Alix Thierart Bernard Catalano LTA 219 Project: Multiple Unique Tunneling Solutions in One Subway Package in Singapore - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account