Les Mines Selbaie Story Concentrator development and operation

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 7
- File Size:
- 6134 KB
- Publication Date:
- Jan 1, 1990
Abstract
"The development and operation of the milling circuits treating the different Selbaie orebodies are discussed in this paper. The project is reviewed from metallurgical evaluation through construction to present operating status. The current flowsheets are described, with discussion of some unusual features.IntroductionThe Selbaie concentrator commenced initial production in August 1981, treating underground B zone copper ore in a single 1500 t/d circuit. Throughput was increased to 1650 t/d in 1985. The mill was expanded in 1986 to treat ore from the A-I zone open pit; an independent circuit was added to selectively treat 5000 t/d of copper-zinc ore. Current total mill throughput through both circuits averages 7200 t/d with the production of approximately 270 t/d of copper concentrate and 230 t/d of zinc concentrate.This paper describes the stages involved in bringing the project from initial laboratory testing to its current status as one of the most important producers of silver, copper and zinc in Quebec and a major employer in the region."
Citation
APA:
(1990) Les Mines Selbaie Story Concentrator development and operationMLA: Les Mines Selbaie Story Concentrator development and operation. Canadian Institute of Mining, Metallurgy and Petroleum, 1990.