"In December 1991, the GRAHM (Groupe de Recherche sur Jes Applications de L'informatique a L'industrie Minerale), of Laval University started a KBAC (Knowledge Based Automatic Control) grinding project with Falconbridge Ltd. The project was shifted to the Kidd Creek concentrator in the summer of 1992, with the first phase involving the collection of data by GRAHM and Falconbridge personnel for the construction and tuning of a dynamic simulator. This grinding circuit dynamic simulator known as DYNAFRAG was used to assess various control strategies, with a PID-based strategy being selected for ease of installation on a Foxboro II A DCS.The ""B"" primary grinding circuit was chosen for the initial strategy development, which is one of three parallel divisions. The KBAC project was successfully completed in November 1994, with subsequent modifications being implemented by Kidd Creek staff.This paper summarizes, the current control strategy, the project costs, and the realized benefits. Some of the problems which were encountered with the initial installation, and the subsequent modifications are also dealt with in this paper.2.0 IntroductionIn the summer of 1992, the GRAHM of Laval University and Falconbridge Ltd. started a project to design a control strategy for the ""B"" grinding circuit at the Kidd Creek Division. Between 1992 and 1994 several papers have been written to describe the control objectives, the methodology followed, and some initial results (Flament, 1994A, 1994B). Since then, however, the control objectives changed, and several improvements were made to the circuit. In particular, maximizing tonnage was no longer a priority, a variable speed drive pump was installed on the cyclone feed, the ball mill power was lowered, and the geometry of the cyclones changed. As a consequence, the control strategy was revised. Table 1 summarizes the historical developments on the ""B"" division grinding control."
Citation
APA:
(1996) Kidd Creek Mines Automatic Primary Grinding ControlMLA: Kidd Creek Mines Automatic Primary Grinding Control. Canadian Institute of Mining, Metallurgy and Petroleum, 1996.