Investigation of Gol-E-Gohar`s fourth circuit performance: Problems and practical solutions

- Organization:
- International Mineral Processing Congress
- Pages:
- 9
- File Size:
- 655 KB
- Publication Date:
- Jan 1, 2014
Abstract
Difference between plant feed specifications in practice and design feed is a problem that most of processing plants face during operating and commissioning. This topic has led to inappropriate operating and necessitates repeating the basic tests on new feed. Gol-E-Gohar fourth concentrate line with a capacity of 2 MTPY, located in Kerman province, is the first iron concentrate plant in Iran in which High Pressure Grinding Roll (HPGR) technology has been applied. Plant's feed consists of 30% AG mills pebbles of lines 1-3 and 70% run of mine crushed ore whose Fe=51%, Fe/FeO=2.5, S=1.7% and work index=15 kWh/t. Desired concentrate has Fe>68% and S<0.7%. After the plant construction and operation commencement, providing design feed was not possible due to the crushing unit`s not being complete, therefore the plant was fed by AG mills pebbles. For predicting optimal conditions of the plant and investigating the possibility of improving the current concentrate specifications, sampling from the new feed and laboratory and pilot tests was performed again. Studies showed that new feed has Fe=41%, Fe/FeO=3.5, work index=17 kWh/t. Results of laboratory tests with Davis tube device and pilot tests run using magnetic separators with simulating the plant`s circuit showed that with current feed, achievable recovery in industrial scale would be 75.52% which compared to plant's recovery in studied period (75.94%) shows that plant operated in optimal conditions. To improve the current concentrate specifications (Fe=66%, S=1.03%, Ferec=75.94%) and for achieving desired concentrate, samples were reground to four fractions with k100= 300, 212, 100, 45 and Davis tube tests were performed on each of the samples separately. Results showed that the fraction whose k100=212 µm or k80=200 µm has respective Fe and S grades of 68.27% and 0.681% which are consistent with the desired concentrate.
Citation
APA:
(2014) Investigation of Gol-E-Gohar`s fourth circuit performance: Problems and practical solutionsMLA: Investigation of Gol-E-Gohar`s fourth circuit performance: Problems and practical solutions. International Mineral Processing Congress, 2014.