Instantaneous Access to Maintenance Data in a Copper Smelter (5c339263-c6a6-4780-b102-4872b9a5d773)

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 8
- File Size:
- 395 KB
- Publication Date:
- Jan 1, 1979
Abstract
The Bingham Canyon Mine, located 48 km (30 mi) southwest of Salt Lake City, Utah, is operated by Kennecott Copper Corporation's Utah Copper Division. This operation is the world's largest open-pit copper mine and produces 96 000 tons (106,000 st) ore and 327 000 tons (360,000 st) waste each day. This material is loaded by large electric shovels and transported by both truck and rail haulage. To meet the requirements of the Clean Air Act of 1970 (as amended), new facilities for the control of smelter emissions were required and are now nearing the final stages of construction. The facility will be capable of treating all the output from the mine, some 2,530 tons (2,789 st) per day of combined concentrate and precipitate. Costing $280 million and necessitating the replacement of reverberatory furnaces with continuous smelting vessels, the plant, with its massive and complex gas handling and acid-making facility, is required to remain on-stream with the minimum of pollution control equipment outages to conform with Federal Regulation 52.2325. As part of this giant effort, the smelter planning team and supervisory staff considered that new, well organized, highly flexible, readily available maintenance information was essential to assist the maintenance personnel in the performance of their duties.
Citation
APA:
(1979) Instantaneous Access to Maintenance Data in a Copper Smelter (5c339263-c6a6-4780-b102-4872b9a5d773)MLA: Instantaneous Access to Maintenance Data in a Copper Smelter (5c339263-c6a6-4780-b102-4872b9a5d773). The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1979.