Installation And Design Guidelines For Cable Dowel Ground Support At ZC/NBHC

The Australasian Institute of Mining and Metallurgy
Askew J. E
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
10
File Size:
575 KB
Publication Date:
Jan 1, 1977

Abstract

All facets of current practices of cable dowelling at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited are re- viewed. This includes materials specific- ations, installation practices and design pro- cedures. Cable dowelling for cut and fill stoping, square set timber stoping, longhole open stoping and level reinforcement is considered. Installation is simple and can be mechanised to eliminate heavy lifting. Quality control is essential for optimum performance of the re- inforcement. Design patterns must consider the mining method, reinforcement economics, acceptable stability standards and mine production priorities.
Citation

APA: Askew J. E  (1977)  Installation And Design Guidelines For Cable Dowel Ground Support At ZC/NBHC

MLA: Askew J. E Installation And Design Guidelines For Cable Dowel Ground Support At ZC/NBHC. The Australasian Institute of Mining and Metallurgy, 1977.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account