Innovat Pilot Plant Trials

Society for Mining, Metallurgy & Exploration
Dan Mackie
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
4
File Size:
878 KB
Publication Date:
Jan 1, 1996

Abstract

Commissioning of a 150 tpd continuous vat leaching pilot plant at Ariel Resource's San Martin Mine began in October, 1995. Functioning of the systems proved to be as designed. Initial tri­als, however, were besieged with problems associated with clay fractions that were much higher than in the ore originally tested. Nevertheless, leach rates were good in the initial and subsequent trials. Difficulties with the viscous solutions generated by the clay fraction continued, requiring modifications to the solution collection methods and investigation of flocculant types and mixing points. Trials with deslimed ore and sand feed demon­strated continuous flow. Current modifications will be tried in late May, 1996, along with selected flocculants, with the objec­tive of leaching continuously without the need to deslime.
Citation

APA: Dan Mackie  (1996)  Innovat Pilot Plant Trials

MLA: Dan Mackie Innovat Pilot Plant Trials. Society for Mining, Metallurgy & Exploration, 1996.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account