Inclusion of risk assessment in open-pit design and scheduling

- Organization:
- The Institute of Materials, Minerals and Mining
- Pages:
- 7
- File Size:
- 3424 KB
- Publication Date:
- Apr 1, 1995
Citation
APA:
(1995) Inclusion of risk assessment in open-pit design and schedulingMLA: Inclusion of risk assessment in open-pit design and scheduling. The Institute of Materials, Minerals and Mining, 1995.