IC 9064 - Short-Delay Blasting In Underground Coal Mines

The National Institute for Occupational Safety and Health (NIOSH)
Richard J. Mainiero Harry C. Verakis
Organization:
The National Institute for Occupational Safety and Health (NIOSH)
Pages:
16
File Size:
2238 KB
Publication Date:

Abstract

The Bureau of Mines has conducted research to determine whether the total elapsed delay time for blasting bituminous coal in underground mines could be safely expanded beyond the present 500-ms limitation without igniting a methane or methane-coal dust atmosphere. The results indicated that the increase of total delay from 500 to 1,000 ms had no detectable effect on safety relative to incendivity as long as permissible practices were observed in all other aspects. Research was also conducted to evaluate the safety of 18-in hole spacing for delay blasting in coal relative to misfires. For a variety of permissible explosives, misfires were observed for about 50 pct of the holes at 18-in spacing. Based on this observation, the Bureau has recommended that the new regulations prohibit hole spacings of less than 24 inches in underground coal mines. Misfires were also observed for 24-in spacing, but the number of misfires and test shots was too small to sup- port any firm conclusions.
Citation

APA: Richard J. Mainiero Harry C. Verakis  IC 9064 - Short-Delay Blasting In Underground Coal Mines

MLA: Richard J. Mainiero Harry C. Verakis IC 9064 - Short-Delay Blasting In Underground Coal Mines. The National Institute for Occupational Safety and Health (NIOSH),

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account